Start with reducer loads
Share output torque, input speed, ratio, external loads, shock cases, duty cycle, and environment. Vehicle payload by itself is not a reducer rating point.
Buyer guide · published September 26, 2026 · reviewed October 6, 2026
Compare suppliers for your AGV cycloidal reducer RFQ; confirm final fit using application data.
The screener organizes questions for supplier discovery. It is not a reducer-sizing calculation, supplier ranking, safety assessment, or promise of price and lead time.
Decision summary
Share output torque, input speed, ratio, external loads, shock cases, duty cycle, and environment. Vehicle payload by itself is not a reducer rating point.
Ask each supplier to quote the same interface, acceptance limits, inspection scope, quantity, delivery location, and warranty basis.
Request model-specific test conditions and sample records for the backlash, stiffness, noise, temperature, and life claims that matter to your design.
Review drawings and samples, then document the acceptance plan and change-control terms before committing fleet volume.
What to compare
Use the same request across shortlisted suppliers. Record the supplier’s stated value, test condition, and supporting document; mark anything not supplied as “not provided” rather than filling gaps with assumptions.
| Dimension | Ask each supplier for | Compare consistently | Gap to resolve |
|---|---|---|---|
| Engineering fit | Model, ratio, rated and peak output torque, input speed, radial/axial loads, and mounting drawing. | Same load cases, interface, environment, and service assumptions. | Unstated load limits or an unreviewed interface drawing. |
| Motion performance | Backlash/lost-motion definition, measurement setup, load, temperature, and report for the offered model. | Same definition and acceptance condition; distinguish catalog maximum from measured sample data. | A headline arc-minute value with no method or conditions. |
| Quality controls | Inspection plan, sample report, traceability fields, nonconformance process, and change notification. | Which checks are performed on every unit, by lot, or only during type testing. | No link from the delivered unit or lot to its inspection record. |
| Delivery and capacity | Lead time for the exact configuration, quote validity, production capacity, and shipment basis. | Same order quantity, start point, destination, and stated assumptions. | A verbal estimate or a schedule that excludes required parts and inspection. |
| Total cost and support | Unit price, tooling/NRE, sample cost, freight, duties, warranty, spares, and service response. | Delivered cost and support obligations across the expected order profile. | A unit-price comparison that omits setup, logistics, or warranty terms. |
The table is a buyer’s comparison framework, not a claim that any supplier tier or country has a universal cost, lead-time, or life advantage.
Check the catalog, ratings, interface drawing, and stated test conditions against the same application brief.
Agree sample configuration and inspection records before ordering; resolve drawing mismatches before installation.
Define representative load, duty, temperature, and acceptance checks with the supplier and your engineering team.
Record approved revision, traceability, change notification, warranty, and escalation contacts in the supply agreement.
Vehicle mass must be translated through wheel radius, gearing, acceleration, braking, and load sharing. Ask an application engineer to confirm the resulting reducer loads.
Check the stated load spectrum, lubrication, temperature, and reliability assumptions. A bearing calculation alone is not a complete gearbox service-life claim.
Compare inspection, validation, spares, downtime exposure, logistics, and warranty obligations with the quoted unit price. Request evidence where those costs depend on performance.
Evidence and limits
Public standards and catalogs help define what to ask for; they do not provide a universal ranking of AGV reducer suppliers. No cross-supplier price, lead-time, market-share, or service-life figures are used in this guide.
ISO 3691-4:2023
ISO describes requirements and verification for driverless industrial trucks and their systems, including AGVs and AMRs. This is system-level context; it does not qualify an individual reducer.
Open primary sourceISO 281:2007
The standard page describes dynamic load-rating and rating-life methods for rolling bearings. Bearing rating life should not be presented as a complete reducer service-life guarantee.
Open primary sourceNabtesco RV-Z/ZC and RV-E product guide
A manufacturer catalog is an example of model-specific product data. Compare the offered model’s own ratings, definitions, and conditions; this reference is not a head-to-head supplier assessment.
Open primary sourceSource pages checked October 6, 2026. Standard status and local regulatory requirements can change; verify the applicable edition and project requirements when approving a design.
Buyer questions
No. Payload is only one system input. The supplier needs the reducer’s output torque and speed duty, wheel geometry, external loads, shock cases, ratio, and mounting details to confirm fit.
Request the exact model and revision, ratings and test conditions, interface drawing, inspection scope, quantity basis, delivery assumptions, warranty, spares, and any tooling or setup charges.
Not by itself. Agree what backlash or lost motion means for your application and ask how, under what load and temperature, and on what sample the stated value was measured.
Ask for separate sample/pilot and production terms, identify minimum quantities and price breaks, and compare the same delivery destination, inspection, support, and warranty basis.
For a new model or supplier, agree an application-representative pilot and acceptance plan before production release. Select the tests with your engineering team based on actual load and duty.
No. ISO 281 concerns rolling-bearing dynamic load ratings and rating life. A reducer life claim also depends on the complete design, load spectrum, lubrication, environment, and validation.
Supplier resources
If Micro Cycloidal is one of your candidates, review its product portfolio and OEM process before sharing requirements. These resources describe the company’s stated offer; confirm the exact model, interface, and acceptance evidence for your application. This guide does not rank other suppliers or pre-approve a reducer for AGV duty.
Next step
Include the reducer loads, required ratio, interface drawing, annual quantity, delivery target, and acceptance criteria so the supplier can respond against a defined configuration.
Inquiry Email
Include ratio, torque, backlash, interface drawings, quantity plan, and destination terms.
Instant Chat
WhatsApp Engineering Support
Use chat for quick routing; drawings and technical details can move to email.